Full Auto Adjustment C Purlin Forming Machine with Pre-punching and Post-cutting detailed informations are as follows:
(1). Forming Steps: 10-14m/min;
(2). High Efficency.
Main Accessories:
1. Main Purline Forming Machine;
2. 3 Tons Hydraulic Uncoiler with Straightening Device;
3. Hydraulic System and Air Pressure System for Punching Holes;
4. Pre-punching Holes Device;
5. Hydraulic System ( there are total two oil cylinders, one for punching holes, one for post forming cutter);
6. PLC Computer Controlling System With Touch Screen ( Brand: Delta from Taiwan);
7. Hydraulic Post Porming Cutter;
8. Run Out Table (4 sets);
9. Tools;
10. Operation Manual.
1. |
Size |
5000*900*1400mm |
2. |
Weight |
3000KGS |
3. |
Hydraulic Power for Uncoiler |
1.5KW |
4. |
Hydraulic Power for Punching |
5.5KW |
5. |
Air Power for Punching |
1.5KW |
6. |
Hydraulic Power for Forming cutter |
2.2KW |
7. |
Voltage |
380V/50HZ/3PH |
8. |
Forming Steps |
7 steps |
9. |
Forming Speed |
10-14m/min |
10. |
Forming Thickness |
2.0mm |
11. |
Thickness for common use and test |
2.0mm( material: stainless steel) |
12. |
Height of Purline |
25mm |
13. |
Width of Purline |
40mm |
14. |
Size for Punching hole |
10*25mm(L*W) |
15. |
Cutting length Tolerance |
± 1mm |
16. |
Punching Hole Tolerance |
± 0.2mm |
17. |
Inside Radius of " C" |
1mm or 2mm |
Q1.Are you a trading company or manufacture.
1A: We are a factory.
Q2. Do you provide samples ? Is it free or extra ?
2A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.We could offer the sample for free charge
3Q: Where is your factory located?
3A: Our factory is located in Xiamen City, Fujian Province, China. You are warmly welcome to visit us !
4Q: Can you make the machine according to my design or prototype?
4A: Yes. We have an professional designer for working out the most suitable design and production plan for the machine that you are going to book with us
5Q: How can I trust you that machines pasted testing running before shipping?
5A: 1) We record the testing video for your reference.
2) You are welcome to visit us and test machine in our factory.
6Q: Do you provide installing and training overseas?
6A: Overseas machine install and worker training services are optional.
7Q: How is your after sales support?
7A: We provide technical support on line as well as overseas services by skillful technicians.
8Q: Guarantee period:
8A: Within one year since the date of finishing commissioning.