C80-250 Purline Machine With Pre-punching And Pre-Cutting:
(1). Forming Steps: 13 steps+3 steps for reshaping;
(2). Forming Thickness: 1.0-3.0mm.
Main Accessories:
A: Main Purline Forming Machine;
B: 3 Tons Manual Uncoiler;
C: Guide Device;
D: Hydraulic System;
E: Hydraulic Motor;
F: PCL Computer Controlling System With Touch Screen;
G: Tools;
H: Operation Manual
1. |
Size |
8500*1500*1400mm |
2. |
Weight |
7500KGS |
3. |
Hydraulic Motor Power |
18KW |
4. |
Voltage |
380V/50HZ/3PH |
5. |
Forming Steps |
13 steps+3 steps for reshaping |
6. |
Forming Speed |
10-14m/min |
7. |
Forming Thickness |
1.0-3.0mm |
8. |
Thickness for common use and test |
2.0mm, 2.5mm(material: Galvanized) |
9. |
Height of Purline |
30mm to 70mm |
10. |
Width of Purline |
80mm to 250mm |
11. |
Cutting Length Tolerance |
± 2 |
Q1.Are you a trading company or manufacture.
1A: We are a factory.
Q2. Do you provide samples ? Is it free or extra ?
2A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.We could offer the sample for free charge
3Q: Where is your factory located?
3A: Our factory is located in Xiamen City, Fujian Province, China. You are warmly welcome to visit us !
4Q: Can you make the machine according to my design or prototype?
4A: Yes. We have an professional designer for working out the most suitable design and production plan for the machine that you are going to book with us
5Q: How can I trust you that machines pasted testing running before shipping?
5A: 1) We record the testing video for your reference.
2) You are welcome to visit us and test machine in our factory.
6Q: Do you provide installing and training overseas?
6A: Overseas machine install and worker training services are optional.
7Q: How is your after sales support?
7A: We provide technical support on line as well as overseas services by skillful technicians.
8Q: Guarantee period:
8A: Within one year since the date of finishing commissioning.