Informations of KLS25-220-530 Standing Seam Metal Roofing Sheet Roll Forming Machine With Adjustment are as following:
1. Material Thickness: 0.5-0.8mm;
2. Effective Width of Roofing: 220-530mm;
Main Accessories:
(1). Main Portable Roll Forming Machines;
(2). 3 Tons Manual Uncoiler;
(3). PLC Computer Controlling System;
(4). Hydraulic Forming Cutter;
(5). Device for adjusting models;
(6). Run Out Table (3 units);
(7). Protective Cover;
(8). Operation Manual;
Usage: Producing standing seam roofing panels.
1. |
Item |
Standing Seam Metal Roofing Sheet Roll Forming Machine |
2. |
Size |
2000*1100*1200mm |
3. |
Weight |
1500KGS |
4. |
Voltage |
380V/50HZ/3PH |
5. |
Motor Power |
2.2KW |
6. |
Power for Hydraulic |
0.75KW |
7. |
Forming Steps |
6 steps |
8. |
Material Thickness |
0.5-0.9mm |
9. |
Standing Height of Roofing |
25mm |
10. |
Thickness for common use and testing machine |
0.6mm, 0.7mm |
11. |
Effective Width of Roofing |
220-530mm |
12. |
Material Width |
316-626mm |
Q&A
Q:Are you a trading company or manufacture ?
A:We are a factory.
Q:Do you provide samples ? Is it free or extra ?
A:Yes, we welcome sample order to test and check quality. Mixed samples are acceptable. We could offer the sample for free charge.
Q:Where is your factory located?
A:Our factory is located in Xiamen City, Fujian Province, China. You are warmly welcome to visit us !
Q:Can you make the machine according to my design or prototype?
A:Yes. We have an professional designer for working out the most suitable design and production plan for the machine that you are going to book with us.
Q:How can I trust you that machines pasted testing running before shipping?
A:1) We record the testing video for your reference.
2) You are welcome to visit us and test machine in our factory.
Q:Do you provide installing and training overseas?
A:Overseas machine install and worker training services are optional.
Q:How is your after sales support?
A:We provide technical support on line as well as overseas services by skillful technicians.
Guarantee period:
Within one year since the date of finishing commissioning