After-sales Service: | 24 Hours |
---|---|
Warranty: | 1 Year |
Certification: | CE |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Full Automated C-Shape Purline Machinery With Pre-Punching and Pre-Cutting:
Main Accessories:
(1) Main Purline Forming Machine;
(2) 5 Tons Hydraulic Un-coiler;
(3) Automatic Guide Device;
(4) Hydraulic Motor System ( there are total three oil cylinders, two for punching holes, one for pre-cutter)
(5) PLC Computer Controlling System with Touching Screen (Brand: Delta Made in Taiwan, or Schneider, or Siemens);
(6) Pre-punching Holes Device( the buyer decide the size of punching holes );
(7) Pre-cutting Device;
(8) Reshaping Device;
(9) PLC Automatic Controlling System For Adjusting Size From 60mm to 300mm; PLC Automatic Controlling System For interchange C to Z Purline;
(11) Run Out Table(4 PCS);
(12) Tools;
(13) Operation Manual.
Technical data:
Size |
8500*1600*1550mm |
Weight |
7500KGS |
Motor Power for auto adjustment models |
0.75KW*3 |
Motor Power for auto guide device |
0.37KW*2 |
Hydraulic Motor Power |
18.5KW |
Forming Steps |
13+3steps for reshaping |
Processing Speed |
10-15m/min |
Voltage |
380V/50HZ/3PH |
Lip for C purline |
15-25mm |
Width of Purline |
80-250mm |
Height of Purline |
30-70mm |
Forming Thickness |
1.0-2.5mm |
Material of principal axis |
high grade 45# forged steel |
Material of roller |
45#steel with hard chrome plating |
Material of blade |
Cr12 mould steel with quenched treatment 60-62°C |
Material for frame of machine |
Fine welded structural steel |
Sprocket wheel |
45 steel high-frequencies quench |
Material for producing the C Purline |
normal galvanized steel |
Feature:
Can automatically adjust any one model of C purlines from 80mm to 250mm within 3 minutes, will save much room, labor, time and cost.
producing line:
Machine detail:
Suppliers with verified business licenses